Buying Guide

How to Spec Consistent Door Packages Across Multi-Unit Projects

By WholesaleDoorHub Team · May 2026

Direct answer: Contractors ordering wholesale wooden interior doors should standardize on 2–3 sizes and one style per project, order prehung for new construction, and submit a complete spec sheet to get 48-hour pricing. Volume orders of 25+ units unlock 8% discount.

How to Spec Consistent Door Packages Across Multi-Unit Projects

Consistency is the key to profitable interior door installation on multi-unit projects. Inconsistent specs create:

  • Multiple SKUs to track and order
  • Installation variation (crews must adapt to different products)
  • Punch-list items from visual inconsistency

Best practice for multi-unit projects:

Project TypeRecommended Standardization
Apartment building1 style, 2–3 sizes, hollow core
Townhome development1 style, 3–4 sizes, hollow or solid core
Single-family subdivision1 style, 3–4 sizes, hollow core standard / solid core upgrade
Luxury residential1 style, custom sizes, solid wood

Door Package Ordering Process

Step 1: Create a door schedule for the project. List every opening with: location, width, height, swing direction, and hardware bore.

Step 2: Standardize specs. Identify the most common size and spec. Minimize variations.

Step 3: Submit the door schedule to WholesaleDoorHub. Include delivery address and required delivery date.

Step 4: Receive pricing within 48 hours. Review and approve.

Step 5: Confirm delivery. Doors arrive on pallets; ensure forklift or loading dock access.

Step 6: Inspect on delivery. Check each unit against the packing list. Report damage within 48 hours.

Interior Door Installation Billing Guide

ServiceTypical Contractor Rate
Prehung door installation (new construction)$65–$120 per door
Slab door replacement$85–$160 per door
Prehung door with hardware installation$95–$160 per door
Closet door installation (bifold or bypass)$75–$140 per door
Pocket door installation$180–$320 per door

FAQ

Q: How many interior doors can a crew install per day?

A: An experienced 2-person crew can install 12–18 prehung doors per day in new construction. Slab replacement is slower: 8–12 per day.

Q: What is the lead time for a complete interior door package?

A: In-stock standard sizes: 1–3 days. Custom sizes or finishes: 3–5 weeks.

Q: How do I handle door damage claims?

A: Inspect all doors on delivery. Report damage with photos within 48 hours. WholesaleDoorHub replaces damaged units at no charge.

Get Wholesale Pricing

48-hour quote turnaround. No minimum order on in-stock items.

We respond within 48 business hours. No spam, ever.